How to reduce costs and increase efficiency in cattle feed production line?
Leave a message
Common pain points in the industry
Low raw material utilization rate (uneven crushing leads to waste);
High granulation power consumption (unreasonable ring die matching);
Large downtime loss (low fault repair efficiency)
Poultry feed production characteristics
Characteristics of raw material composition (mainly corn-soybean meal type, high starch content required);
Particle requirements (diameter 2.5-4mm, hardness and palatability balanced).
Cost structure breakdown (taking the cost of a ton of material as an example)
Raw material cost (60-70%), energy consumption (15-20%), labor (5-8%), equipment loss (5-10%).

|
Model |
Capacity |
Dimension |
Weight |
|
MK-125 |
80-100kg/h |
110*35*70 cm |
95 kg |
|
MK-150 |
120-150kg/h |
115*35*80cm |
100 kg |
|
MK-210 |
200-300kg/h |
115*45*95cm |
300 kg |
|
MK-260 |
500-600kg/h |
138*46*100cm |
350 kg |
|
MK-300 |
700-800kg/h |
130*53*105cm |
600 kg |
|
MK-360 |
900-1000kg/h |
160*67*150cm |
800 kg |
|
MK-400 |
1200-1500kg/h |
160*68*145cm |
1200 kg |
| 1.Used for making animal feed pellets
2.Used for making wood pellets as fuel 3.Raw material size need 3-5mm ; Humidity :10-12% |
|||
Raw material optimization program
Replace part of corn with wheat (enzyme preparations need to be added);
Replace soybean meal with miscellaneous meal (cottonseed meal/rapeseed meal) (pay attention to the balance of amino acids).
Pretreatment technology
Grading and crushing of raw materials (coarse crushing of corn + fine crushing of soybean meal);
Precise moisture control (infrared detector ±0.5% error).
Key points for process optimization
Conditioning section
Improvement of steam quality (dry saturated steam pressure 0.3-0.4MPa);
Application of multi-layer conditioner (residence time extended to 45 seconds).
Pelletizing section
Optimization of ring die selection (recommended compression ratio of poultry feed 1:6-1:8);
Frequency feeder control (matching the current load of the main machine).
Personnel and Operation Optimization
Develop SOP manual (such as tempering temperature deviation within ±2℃);
Key position certification (granulator operator requires 200 hours of training).
Production scheduling optimization
Continuous production for more than 8 hours (reduce start-stop energy consumption);
Order batch consolidation (reduce mold change frequency).
If you have any questions or needs about our equipment, please feel free to contact us.