This article will share some tips on the maintenance of aquatic feed production line equipment to help you better understand and master the knowledge in this field.
1. Equipment installation and commissioning
1. Before installing the equipment, a comprehensive inspection of the construction site should be carried out to ensure that the construction site meets the requirements for equipment installation. At the same time, the performance parameters of the equipment should be tested to ensure that the equipment can meet production requirements.
2. When installing the equipment, it is necessary to operate in accordance with the requirements of the equipment manual to ensure that the installation location, fixing method and electrical connection of the equipment meet the requirements. During the installation of the equipment, attention should be paid to protecting the parts of the equipment to avoid damage or wear.

|
Model |
Power(KW) |
Feeder (KW) |
Cutter(KW) |
Productivity t/h |
Dimension(mm) |
Weight(kg) |
|
DF-40 |
4.0 |
0.4 |
0.4 |
0.04-0.05 |
1400*1030*1200 |
240 |
|
DF-50 |
11 |
0.4 |
0.4 |
0.06-0.08 |
1400*1030*1200 |
320 |
|
DF-60 |
15 |
0.4 |
0.4 |
0.12-0.15 |
1450*950*1430 |
480 |
|
DF-70 |
18.5 |
0.4 |
0.4 |
0.18-0.25 |
1600*1400*1450 |
600 |
|
DF-80 |
22 |
0.4 |
0.75 |
0.3-0.35 |
1870*1360*850 |
800 |
|
DF-85 |
22 |
0.4 |
0.75 |
0.3-0.35 |
2300*1170*1400 |
890 |
|
DF-90 |
30 |
1.1 |
1.5 |
0.4-0.45 |
2300*1170*1400 |
1200 |
|
DF-100 |
37 |
1.1 |
1.5 |
0.45-50 |
2000*2800*1200 |
1500 |
|
DF-120 |
55 |
1.1 |
2.2 |
0.5-0.7 |
2200*2900*1200 |
1850 |
|
DF-135 |
75 |
1.1 |
2.2 |
0.8-1.0 |
2200*3100*1370 |
2500 |
|
DF-160 |
90 |
1.5 |
2.2 |
1.2-1.5 |
2200*3150*1370 |
2800 |
|
DF-200 |
132 |
3 |
3 |
1.8-2.0 |
2300*3450*1650 |
3000 |
3. After the equipment is installed, the equipment should be debugged to ensure that the performance indicators of the equipment meet the design requirements. During the debugging process, pay attention to the operating status of the equipment and deal with problems in time.
2. Equipment operation and monitoring
1. During the operation of the equipment, the equipment should be checked regularly to ensure the normal operation of the equipment. The inspection content includes the mechanical parts, electrical parts, transmission parts, etc. of the equipment, and any abnormalities should be dealt with in time.
2. During the operation of the equipment, the equipment should be kept clean to prevent dust, dirt, etc. from affecting the normal operation of the equipment. At the same time, the equipment should be lubricated regularly to ensure that the lubrication system of the equipment works normally.
3. During the operation of the equipment, the monitoring of the equipment should be strengthened to ensure the safe production of the equipment. The operating status of the equipment can be monitored in real time by installing monitoring instruments and setting alarm devices, and alarms can be issued in time if abnormalities are found.