300-500 kg/h Poultry Feed Starter Production Line
A 300-500 kg/h poultry feed starter production line does not have to pellet from day one. Phase 1 grinds, blends, doses the micro ingredients, weighs and bags mash.
Description
What phase 1 does buy is the machinery that does the daily work: a grinding mill, a 500 kg batch mixer, a 300 kg platform scale, a 30 kg by 1 g dosing scale for the premix, vitamins, minerals and the amino acids, a 50 kg filling spout, a sewing head on a steel stand, magnets and metal traps in the right places, and a modest dust setup that does not require a building conversion or a hired maintenance engineer. Every one of those items stays in the plant when phase 2 arrives. Nothing bought now is thrown away, and nothing bought now has to be replumbed to make pellets later.
H2-01Should a New Haitian Poultry Starter Mill Begin With Mash or With Pellets?
Codex Alimentarius code of practice on good animal feeding
Pelleting costs four things that mash does not: a press drawing 15 kW instead of nothing extra, a conditioning and cooling step, a die set that wears and has to be bought, and floor area and height a compact site may not have. What it buys is a denser, less dusty feed with less wastage at the feeder, and for a starter ration aimed at day-old birds there is a real argument that mash is perfectly acceptable, especially on a hopper feeder rather than a pelleted feeder.
The sharper argument is the one about risk. A first-phase plant has to prove a recipe, train two operators, find a supplier chain for micro ingredients and build a customer list, and none of that depends on whether the feed is a pellet. If you buy the press now and the formulation changes, or the market asks for a cheaper grower mash instead of a starter pellet, the press is the one piece of steel you cannot re-purpose without rebuilding the bay around it. Buy it in phase 2 and phase 1 has bought the grinder, the mixer, the scales, the bagging station and the dust setup, every one of which is still exactly what you need.
The line is set up so phase 2 is a bolt-on rather than a rebuild: the mixer discharges at the same rate the mill will consume, the mill sits downstream of the mixer on the same floor level, and the magnets and dust extraction already in place in phase 1 cover the mill inlet as well as the mixer inlet. Phase 2 adds 15 kW of motor power, which is the one item needing a check against your supply, and it is the reason the electrical question is worth answering now rather than in year two.
H2-02What Equipment Set Covers Grinding, a 500 kg Batch Mixer and Bagging at 300-500 kg/h?
small poultry feed production line
A 300-500 kg/h poultry feed starter production line is eight line items rated to the capacity band your enquiry gave: six process machines and two support assemblies, of which the grinding mill and the mixer carry a confirmed motor rating from the machine library.
| Unit | Model | Service kg/h | Batch or load | Motor kW |
|---|---|---|---|---|
| ------ | ------- | ---------------- | --------------- | ---------- |
| Grinding mill | MH-420 | 600-1000 | continuous, one operator feed | 7.5 |
| Batch mixer, horizontal | KW-500 | 2000 rated | 500 kg per batch charged by hand | 7.5 |
| Platform scale, 300 kg | to be confirmed | n/a | per bag and per batch check | none |
| Dosing scale, 30 kg x 1 g | to be confirmed | n/a | per micro-ingredient | none |
| 50 kg bagging filling device | to be confirmed | 300-500 | per bag | to be confirmed |
| Sewing head on a steel stand | to be confirmed | bag by bag | per bag | to be confirmed |
| Magnet and metal trap set | to be confirmed | line wide | four positions | none |
| Dust extraction, simple | to be confirmed | at grinder and bagging | continuous while running | to be confirmed |
| Flat die pellet mill, phase 2 only | BH-260 | 400-500 | continuous | 15 |
| Voltage-Frequency | Duty | Confirm with factory |
|---|---|---|
| ------------------- | ------ | ---------------------- |
| three phase 190/380 V dual voltage, 50/60 Hz dual frequency | part load at 300-500 kg/h | confirm dual voltage on the plate; whether a 300-500 kg/h class grinder exists; MH-420 listed at the full 600-1000 kg/h |
| three phase 190/380 V dual voltage, 50/60 Hz dual frequency | one batch per cycle, discharge by hand | batch time and mixing uniformity; library holds no batch figure |
| single phase mains with neutral | manual, operator reads | model and graduation |
| single phase mains with neutral | operator | model, graduations, tare |
| to be confirmed | manual fill from the mixer discharge | model, spout height, bag holder |
| to be confirmed | stand bolts to the floor or bench | model, needle and thread service |
| none | permanent magnet in a housing | size, housing, clean-out access |
| three phase 60 Hz, voltage to be confirmed | cyclone plus negative pressure | fan kW, filter, duct run |
| three phase 190/380 V dual voltage, 50/60 Hz dual frequency | not in phase 1 | die set, roller clearance; dual voltage on the plate |
Phase 1 is eight line items: six process machines, which are the grinding mill, the horizontal mixer, the 300 kg platform scale, the 30 kg x 1 g dosing scale, the 50 kg filling device and the sewing head, and two support assemblies, which are the magnet and metal trap set and the dust extraction unit. The grinding mill and the mixer are the only two units on this page with a confirmed motor rating; the other six are listed by duty and their models are to be confirmed with the factory.
Three of those rows need a sentence each.
On the 300-500 kg/h grinder. The library's smallest electric hammer mill in this class is MH-420 at 7.5 kW and 600-1000 kg/h, and it is our recommendation for the phase 1 grinding duty: the motor size matches the rest of the board, the capacity sits above your band so the machine runs at part load for one batch and then rests, and at 1400x600x750 mm and 130 kg it is the lightest and shortest unit in the quotation, which matters on a compact site. If diesel is easier to fuel than electricity at your bay, the second route is the hammer crusher HM420-280A at 15 HP, 250-500 kg/h, net 370 kg and gross 390 kg, 1650x800x1120 mm. It covers your band on its own and adds no motor load to the board, but it adds a second fuel system and a second set of wear parts to train two operators on. Our recommendation is the MH-420 electric frame for phase 1 with the HM420-280A held as the alternative. The library holds no starting-current figure for either frame, and the exact amperage is read off the plate before the supply is checked.
On the 500 kg per batch charging requirement. The 500 kg per batch figure is the charging requirement you specified, so it sets the mixer, not the line rate. The library rates both mixers in kg/h rather than kg per batch, which leaves two units to compare: the horizontal KW-500 at 7.5 kW and 2000 kg/h, 2974x910x1400 mm, and the vertical KW-500 at 3 kW and 1000 kg/h, 1930x600x1100 mm. Neither record gives a batch time or a mixing uniformity figure, so the batch time in minutes and the uniformity or CV are to be confirmed with the factory. Our recommendation is the horizontal KW-500: a 500 kg batch is a quarter of its 2000 kg/h rating, so the cycle is short and the frame discharges fast enough to stay ahead of a 400-500 kg/h mill, and at 2974 mm it uses the long axis of the bay that is already being planned around it. Choose the 3 kW vertical unit only if the bay cannot take a 2974 mm machine, because it costs less to run and takes very little floor, at the price of a slower cycle. In either case the 500 kg is set by how you charge the mixer, not by the rating.
On the mixer and the mill rate. A 500 kg batch and a 400-500 kg/h mill are the same hourly rate, which is what makes the phase 1 mixer the phase 2 feeder.
H2-03How Accurate Must the 30 kg x 1 g Scale Be for Premix, Vitamins and Amino Acids?
Because the dose is measured in grams and the batch in kilos. Work it for your own starter formula: on a 500 kg batch, a vitamin and mineral premix at 1 percent of the ration is 5 kg, which any 30 kg scale handles. But DL-methionine or threonine at 0.1 percent of the ration is 500 g, and lysine at 0.15 percent is 750 g. Those are the ingredients that decide whether a starter batch is a starter batch or simply feed, and they are dosed in gram quantities into a kilo weighing.
A 30 kg scale with a coarse graduation can hold that 500 g as a single load, but you lose the check: you cannot count the scoops, you cannot record five times 100 g on the batch ticket, and you cannot repeat the exact dose next batch when the supplier swaps a grade. At 1 g resolution the operator weighs 500 g in one scoop, reads it and writes the number. Three things follow. The batch sheet becomes a record instead of a gesture. The dosing error on a micro ingredient stays a tiny fraction of the dose, because the scale is reading grams rather than a pile. And the same scale runs the mineral and vitamin premix in phase 2 as in phase 1, so you are not buying another scale when the mill arrives.
The one thing to check before ordering is tare and platform size: a 30 kg by 1 g unit is a bench instrument, and on a bagging floor beside a 300 kg platform scale it needs its own bench with no vibration from the mixer. Send the starter formulation you intend to run, in percent per ingredient, and we will check whether 30 kg by 1 g covers every micro-ingredient dose or whether one or two items need their own smaller weighing.
Send the starter recipe in percent and we will check every micro-ingredient dose against the 30 kg x 1 g scale. Ask for the dosing check →
H2-04Which Magnet and Metal Trap Positions Protect the Mixer and the Future Pellet Mill?
Four positions, and the first three are on the line you are buying now.
- Raw intake, before the grinding mill. Feed bags arrive with stitching wire, and a ration freighted in from a mill carries the odd bolt. A permanent magnet housing in the feed chute catches it before the hammer mill, because a hammer that hits steel does not stop, it changes, and the fragments go straight into your batch.
- Grinding discharge, ahead of the mixer inlet. The second trap, worth the money because it is the last cheap chance to catch what the hammers threw off.
- Mixer top inlet. A plate magnet or a grille with a magnet over the mixer mouth, so anything surviving the first two does not end up as a stranger in a bag.
- The mill feed, phase 2. The same housing is specified at the mill inlet when BH-260 arrives, and it is already in the piping plan, which is one reason to specify the magnet set in phase 1 rather than retrofit it in phase 2.
What to confirm with the factory is magnet diameter, housing material and whether the clean-out is a quick-release cover or a bolted lid, because a magnet you cannot clear without a spanner is a magnet that gets bypassed after a week.
H2-05How Do Three-Phase 60 Hz Ratings Work for Haitian Mains Supply and Backup Power?
This 300-500 kg/h poultry feed starter production line has to live with the supply that actually exists in Haiti, and Haiti runs three phase at 60 Hz, on mains and on the smaller commercial generators most feed plants in the region already own, and the three phase outlets at a working bay are commonly in the region of 190 V line voltage, with 380 V available on the heavier circuits. Two things follow from that, and the second one is the one that decides whether your phase 2 mill is a bolt-on or a wiring job.
Motors are specified three phase, dual voltage 190/380 V, dual frequency 50/60 Hz. Both the 7.5 kW frames and the 15 kW frame are quoted on that basis, and the motor plate is the only thing that settles it for your order. A plate wired for 380 V only will not start on a 190 V supply, and the reverse is just as true, so the plate is read before anything is shipped, not at commissioning.
Phase 1 ships as 190 V three phase 60 Hz motors. The grinding mill at 7.5 kW, the horizontal mixer at 7.5 kW and the dust fan are the units that sit on the bay board every working day, and they are supplied on the 190 V three phase 60 Hz rating. When you come to add BH-260 in phase 2, confirm that its motor plate is dual voltage 190/380 V before the feed to the bay is specified: if it is not, the upgrade stops being a machine delivery.
Shaft power holds at 7.5 kW for the grinder, 7.5 kW for the mixer and 15 kW for the phase 2 mill whichever frequency the plate is set for. Nameplate current moves with frequency, and the library holds no 60 Hz specific value and no 190 V current value, so the exact amperage is read off the plate before the supply is checked.
What to verify on site, since this decides whether phase 2 is a plug-in or a civil job:
- Phase availability at the bay. Three phase to the bay where the mixer and the mill will stand, with a neutral available for the two manual scales.
- Motor start type. The library holds no starting figure for BH-260, so the question to answer before quoting is whether the site has a reduced-voltage starter, a star-delta arrangement, or standby capacity large enough to carry the first seconds of the mill start. Those alternatives are priced differently, and it is cheaper to decide now than to add a starter after the mill ships.
- Backup. Most plants here run a standby set for the hours when the mains drops, and the load schedule matters more than the rating: the grinder and mixer are rarely wanted at the same instant as the mill, so size the standby against what runs together, not what is bought.
- Single phase items. The two manual scales and the sewing head are mains items needing the neutral, worth checking on the bay board now rather than at commissioning.
Send what three phase supply exists at the bay, in kilowatts or in generator rating, and which machines you would want running together during a mains failure, and we will come back with the load schedule and the starter recommendation for the 15 kW mill.
H2-06What Floor Area and Bay Layout Fit a Compact Poultry Starter Plant on a Tight Site?
Phase 1 is small, which is the point of sizing a 300-500 kg/h poultry feed starter production line honestly instead of quoting a 1 t/h plant. The two confirmed machines occupy 0.84 m² and 2.71 m² of floor: the grinder at 1400x600x750 mm and the horizontal mixer at 2974x910x1400 mm, which is 3.55 m² of machine footprint. Add a working aisle of about a metre front and back of the mixer, a bagging bench and a wall or 20 ft container for raw bags, and a single bay of roughly 6 m by 5 m, which is 30 m² of floor, is comfortable and leaves headroom for a hopper when the mill arrives.
Three layout rules matter more than the square metres:
- Put the mixer on the long axis. At 2,974 mm it is the longest item, so run it along the 6 m wall with the 910 mm face toward the loading door. It passes a standard 20 ft container door lengthwise, since only its 910 x 1400 mm section has to clear the opening.
- Keep the dosing bench away from the mixer. A 30 kg by 1 g bench next to a running 7.5 kW mixer reads the vibration, and vibration is exactly what ruins a gram reading.
- Hold the height. A filling spout and a bag holder need clear height above the bench, and phase 2 needs clear height at the mill for the die change and roller withdrawal. A bay with 3.5 m clear does both without a second floor.
Phase 2 adds BH-260 at 130x53x105 cm, which is 0.69 m² of floor and 1.05 m of height taken from the packing dimensions, sited downstream of the mixer discharge on the same slab. Nothing moves and the bay gets about two metres longer, not rebuilt. Take the bay height as a planning assumption for now: the spout, the bag holder and the mill's die change all need clear space above the machine, and the figures above are machine dimensions rather than a clearance study.
Tell us the bay dimensions you have and we will lay the phase 1 machines out in them. Request the layout drawing →
H2-07How Is Dust Kept Down During Grinding and Bagging Without a Full Extraction Plant?
NFPA standards for combustible dust handling
pellet machine for poultry feed
Full extraction is a building project: a ventile bank, a ceiling duct grid, a cyclone outside the wall and a filter maintenance schedule. You do not need that for a 300-500 kg/h starter line, and you certainly do not need it on a 300-500 kg/h poultry feed starter production line where two operators are working inside the same bay. What you need is a small system that captures the two dust points and does not spit fine mash back into the room.
Those points are the grinding chamber and the filling spout. Grinding on a 7.5 kW hammer mill throws a fine plume out of the discharge, and that is also where the heat is, which is why the figures from tpoultryfarmequipment, a public poultry equipment reference, are useful as a target rather than a guarantee: they cite under 10 mg/m3 for workshop dust, cyclone efficiency of 85 to 92 percent, negative pressure in the grinding chamber of 0.8 to 1.2 m/s and grinding chamber temperature held under 45 degC. That is a third-party reference, not our own test data.
The practical setup, with fan rating to be confirmed with the factory:
- Close the grinder. A discharge hood over the mill outlet ducted to a cyclone, with the mill at negative pressure so the plume goes into the cyclone rather than the room.
- Cyclone, then a vented bag or a wet settling box. The cyclone takes the coarse fraction; whatever escapes goes to a small bag filter emptied by hand. That is the part a full plant would replace with a ventile bank, and it is the one you can service with a screwdriver.
- Local extraction at the spout. A small suction hood at the 50 kg filling point on the same fan, which keeps the bag filling point clean and does duty as the operator's breathing zone.
- Housekeeping is the rest of the answer. A sealed bag on the raw intake, a covered ticket box, a broom and a weekly look at the duct joints. Most dust problems in a plant this size are a leaking joint and a floor nobody swept.
H2-08What Does a 50 kg Bagging Filling Device and a Stand-Mounted Sewing Unit Handle Well?
Fifty kilos per bag is right for a poultry starter sold to a farm that carries its own feed: one person fills it, carries it and stacks it, and the 50 kg sack is the standard unit in the region.
The filling device is a spout and a bag holder at the mixer discharge or a dedicated bench, not a packing machine. The operator lifts a 50 kg sack onto the holder, opens the discharge gate, fills to a mark or to the bag's own weight, strips the sack off and moves it to the sewing head. Two things to confirm with the factory before ordering: the spout height against a 50 kg sack and against your tallest operator, and whether the bag holder is a floor-standing post or a benchtop clamp.
The sewing unit on a steel stand is the piece most often specified wrong. A hand-held head is fine for light farm bags, but at 50 kg and a few hundred bags a day the operator needs the head at a fixed height on a stand that bolts to the floor or bench, with the bag held against a plate so the seam is straight and the needle is not carrying the weight of the sack. The stand also keeps the head where it is, which is what stops a sewing machine becoming a hand tool after a month.
H2-09Which Single-Year Spare-Part Package Matches a First-Phase Starter Line?
One year, because a 300-500 kg/h poultry feed starter production line should be buying its second-year parts out of its own earnings rather than out of the first order. The package below is listed by machine, because that is how it is priced: one grouped package per unit, each one itemised rather than sold as a single lump sum.
| Item | Model it belongs to | Coverage | Note |
|---|---|---|---|
| ------ | --------------------- | ---------- | ------ |
| Mixer wear | KW-500 horizontal, 7.5 kW | blade or ribbon section and a shaft seal set | batch time and uniformity to be confirmed with the factory |
| Screen plate and hammers | MH-420, 7.5 kW | one screen set and one set of hammer tips | the true consumable, ordered by the tonne ground |
| Bearings | MH-420 and KW-500 | standard industrial sizes | replaceable at any local bearing shop |
| Belts | MH-420 and KW-500 | one drive belt set per machine | standard section, stocked locally |
| Electrical | panel side of both units | contactors, start and stop buttons, one set of fuses | the parts that fail on a panel, not the panel itself |
| Scale parts | 300 kg platform scale and 30 kg x 1 g dosing scale | load cell, tare and sensor set, to be confirmed | model required before this line can be priced |
| Sewing consumables | sewing head on the steel stand | needles, thread spools and the sewing plate | what you replace every season |
| Scale mounting, magnet servicing | magnet set | magnet cleaning tool and housing gasket | keeps the trap honest |
| Dust service | simple cyclone and bag filter | cyclone wear lining and one set of filter bags | the filter is the annual item |
| Phase 2 hold-back | BH-260, phase 2 order | a note reserving the die set and roller set | so the mill arrives with its wear kit priced |
How the number is put together. Both the one-year package and a longer package covering the second year are quoted the same way: as a line-by-line list, each item priced separately, on an EXW basis for the units as configured in your quotation. Nothing is bundled into a single package price you have to take or leave, so you can drop the two lines you do not want and still know what the rest cost. The final figure in US dollars is issued on the formal quotation sheet once the machine list is frozen, because the die, the screen and the bearing sizes follow the models you actually confirm. Send the models you want and the package comes back priced line by line. Request the one-year package priced →
H2-10When Does the BH-260 Pellet Mill Become the Sensible Second-Phase Upgrade?
A 300-500 kg/h poultry feed starter production line reaches the point where the pellet mill makes commercial sense when the mash line cannot sell what the market wants, or when the birds reject the feed. Three triggers, in the order we would watch for them.
- A customer asks for a pellet. A buyer who pays more, or a contract that specifies one, is the cleanest trigger and needs no analysis.
- Feed wastage at the feeder becomes visible. Mash at a hopper gets pecked, scattered and sorted by a bird, and if the spillage is worth more than the extra cost per kilo that pelleting adds, the mill pays for itself out of the difference.
- The recipe needs the density. Some starter specifications for early growth call for a harder, denser particle that mash cannot hold together.
Why the upgrade is cheap: the grinder already delivers 600-1000 kg/h, above the 400-500 kg/h the mill will take, so it stays. The mixer already delivers 500 kg per hour, the mill's hourly rate, so it stays. The magnets, the dust extraction and the bay layout already cover the mill inlet. Phase 2 adds BH-260 at 15 kW, its die set and rollers, the mill feed magnet, a 15 kW feed to the bay and about two metres of bay length. Nothing is dismantled. The library figure for the mill is 400-500 kg/h, 15 kW motor, 320 kg machine weight, 130x53x105 cm, flat die construction, die holes adjustable across 2-8 mm, and phase 1 is quoted without it, so you approve the mill on its own schedule and it can ship in the same lot.
Tell us your trigger, whether it is a buyer or a bird, and we will price the mill as a separate phase 2 line. Request the phase 2 upgrade quotation →
H2-11What Drives the FOB Quote, the CIF Rules to Haiti, Lead Time and Warranty Cover?
One frozen bill of materials drives everything below, whether you buy this 300-500 kg/h poultry feed starter production line as a phase 1 mash plant or add the mill in phase 2. Phase 1 is quoted FOB, and CIF to Haiti follows the same BOM with the freight step added once packing dimensions and net and gross weights are confirmed on the packing list.
| Item | How it is quoted | Confirmation needed |
|---|---|---|
| ------ | ------------------ | --------------------- |
| Phase 1 equipment | FOB per machine from the BOM, or FOB for the set | final machine list; the six units still to be confirmed are the filling device, the sewing head, the magnet set, the dust fan, the 300 kg platform scale and the dosing scale |
| Phase 2 mill | separate quotation for BH-260 on 15 kW, priced on its own line | mill configuration, die set, roller set, dual voltage on the plate |
| CIF Haiti | added to the frozen BOM once packing dimensions and weights are fixed | net and gross weight per crate, total cubic volume, route to your port |
| Minimum order quantity | one set of the phase 1 line | n/a |
| Lead time | two-tier window written into the proforma: the standard configuration as listed, plus extra time if you order a non-standard build such as a cut-to-order die set or a bespoke mixer trough | production slot fixed at the moment of order |
| Warranty | the machine cover and the exclusions are stated in the contract annex | the period, the claim route and who pays the freight on a claim |
| After-sales | remote guidance in English plus the manuals, with on-site commissioning and operator training quoted separately if you want them | whether you take the on-site day or the remote route |
| Spare parts | the one-year package in H2-09, priced as a line-by-line EXW list; a longer package covering the second year quoted the same way on request | the models that fix the die, screen and bearing sizes |
| Photos and video | photographs of the machines you are buying, plus the run-test video recorded on this unit before shipment, supplied with the documents | the configuration actually built for you |
| Documents | packing list, proforma invoice, origin declaration and the HS code per machine | stated on the proforma invoice |
Warranty and after-sales cover. The binding wording is in the contract annex, not in a selling e-mail, and you should read two things in it: the period the machines are covered for, running from the date of the bill of lading, against defects in material and workmanship; and the exclusions, which are the wear parts, meaning dies, rollers, hammer tips, screen plates, belts, bearings and seals, because they are consumables rather than defects. What the supply normally carries as standard practice is an English manual per unit, remote guidance by message and video for the first start-up and the first die change, and a parts list with the part numbers so your own store can reorder without coming back to us. On-site commissioning and a training day for your two operators are quoted separately. The number that matters most to a plant that has stopped is the response window for a fault, and that window belongs in the annex rather than in a promise made before the order.
Lead time. It is set at order confirmation and written into the proforma, and it has two tiers by design: the window for the configuration listed in your quotation, and the longer window any non-standard build adds, whether that is a die set cut to your own bore pattern or a mixer trough built to a different size. If the mill is in the same lot, note that its window is quoted separately in phase 2. Nothing on this page should be read as a promise of days; the two numbers that count are the ones on the proforma you sign.
Photos and video of the machines you are buying. The quotation package carries photographs of the actual units built against your configuration, and the run-test video of this unit is recorded at the factory before shipment and released with the shipping documents, so what you see is what arrives. If you want photographic references of a comparable 300-500 kg/h poultry line as well, those come from what is on file and are sent on request; where the archive does not hold a shot of the line you asked for, we will tell you that rather than send you a picture of something else.
Two things move the CIF number more than people expect on a line this size. The first is cubic volume: the horizontal KW-500 mixer alone is 2974x910x1400 mm and the lot is dominated by its crate, so the packing list matters more than the machine count. The second is the six units still to be confirmed, which we would rather settle before the proforma than leave for the freight forwarder to guess.
Give us the recipe, the bay supply and the unit models, and we will return the phase 1 FOB price, the CIF Haiti figure, the one-year package priced line by line and the phase 2 mill quotation in one reply. Request the full phase 1 quotation →
Line summary, phase 1
Note on the power figure: the total below is summed from the two rated machines in the table above, with the units still to be confirmed excluded.
| Item | Value | Basis |
|---|---|---|
| ------ | ------- | ------- |
| Units in phase 1 | grinding mill, batch mixer, 300 kg platform scale, 30 kg x 1 g dosing scale, 50 kg filling device, sewing head on a stand, magnet and metal trap set, dust extraction | eight line items: six process machines and two support assemblies |
| Supply to the bay | three phase 60 Hz, about 190 V phase 1 motors, dual voltage 190/380 V and dual frequency 50/60 Hz on the plate | dual voltage to be confirmed again on the phase 2 mill plate |
| Confirmed motor power | 15 kW (7.5 kW grinder plus 7.5 kW mixer) | summed from the two single-machine ratings in the table above |
| Units still to be confirmed | filling device, sewing head, magnet set, dust fan kW | not held in the machine library |
| Phase 2 added later | BH-260, 400-500 kg/h, 15 kW, 320 kg, 130x53x105 cm | library values, quoted separately |
| Planning output | 300-500 kg/h of mash | the band in the enquiry |
| Batch rate | 500 kg per batch, the charging requirement you specified, matching the 400-500 kg/h mill | library rates the mixer in kg/h; batch time and uniformity to be confirmed |
| Machine floor area phase 1 | 3.55 m², bay planned at 6 m x 5 m | packing dimensions plus aisle |
| Operators | 1 to 2 | one at the grinder and mixer, one at the bagging desk |
| Marine shipment | crate dimensions per machine, total volume on the packing list | to be confirmed on the packing list |
Process flow, phase 1 mash and the later pellet add-on
H2-12FAQ: 300-500 kg/h Poultry Feed Starter Line Phase 1 Mash Plant
Q1: Can the phase 1 line make mash today and pellets later without replacing the mixer?
Yes, and the numbers are why. A 300-500 kg/h poultry feed starter production line is built around one hourly rate from the grinder through to the bag, and phase 1 blends a 500 kg batch per cycle while the phase 2 mill BH-260 takes 400-500 kg/h, the same hourly rate, so the mixer bought now is the mixer that feeds the mill later. The grinder also covers it: MH-420 is rated 600-1000 kg/h, above the mill's consumption, and if diesel is easier to fuel at your bay the HM420-280A at 15 HP and 250-500 kg/h covers the same duty on its own. Phase 2 adds the mill, its die and roller set, the mill feed magnet, a 15 kW feed to the bay and about two metres of bay length. Nothing is dismantled, and the dual voltage 190/380 V plate on the mill is the one thing to confirm before the feed is specified.
Q2: Is a 30 kg x 1 g scale really necessary for a 300-500 kg/h poultry line?
It is necessary if your formulation carries micro ingredients in gram doses. On a 500 kg batch, 0.1 percent methionine is 500 g and 0.15 percent lysine is 750 g, and at 1 g resolution the operator weighs that in one scoop, reads it and writes it on the batch ticket. Without the resolution you cannot count the scoops, cannot repeat the dose when the supplier changes grade, and the dosing error becomes the difference between a starter batch and a feed. Check the scale against every micro-ingredient in your recipe before ordering.
Q3: Will 190 V three phase 60 Hz equipment run directly on Haitian supply?
Phase 1 does. The grinder and the mixer ship as three phase 190 V, 60 Hz, dual frequency and dual voltage 190/380 V motors, so shaft power holds at 7.5 kW for each and the machines start on the supply at the bay. Check the plate before shipment rather than at commissioning, because a single-voltage 380 V frame will not start on a 190 V outlet. For phase 2, the BH-260 at 15 kW must be confirmed dual voltage on its plate before the feed to the bay is specified, or the upgrade turns into a wiring job. What to verify now is three phase at the bay, the neutral for the two manual scales, the starter arrangement for the 15 kW mill, and what you want running together on the standby set. The library holds no 190 V and no 60 Hz current value, so the exact amperage is read off the plate.
Q4: What minimum floor area and headroom does the compact starter layout need?
The two confirmed machines take 3.55 m² of floor: 1.4 x 0.6 m for the grinder and 2.974 x 0.91 m for the horizontal mixer. Plan a single bay of roughly 6 m by 5 m, which is 30 m², with about a metre of aisle in front of the mixer, the bagging bench and space for the raw bag store. Headroom needs 3.5 m clear to cover the spout height and the mill's die change and roller withdrawal later.
Q5: How is the phase 2 pellet mill upgrade priced and shipped alongside phase 1?
It is priced on its own line so you approve it separately, and it can ship in the same lot as phase 1 if you want it at commissioning. The quotation covers BH-260 at 400-500 kg/h on 15 kW, the die set across 2 to 8 mm, a roller set, the mill feed magnet and the 15 kW feed to the bay. Phase 1 FOB and CIF Haiti come from the same frozen bill of materials, and cubic volume is driven by the crate dimensions on the packing list.
What to send us next. Four things and the phase 1 quotation is out: the starter recipe in percent by ingredient, so the 30 kg x 1 g scale can be checked against every dose; the supply at the bay, in kilowatts or in the rating of the set you already run; the bay dimensions so the machines can be laid out in them or the 3 kW vertical mixer put in place of the 7.5 kW horizontal one; and the unit models you want confirmed, which is what fixes the die, the screen and the bearing sizes in the spare-part package. What comes back is the phase 1 equipment list with FOB and CIF Haiti priced, the one-year package as a line-by-line EXW list, the lead-time window tiered for the standard build and any non-standard additions, the warranty and after-sales cover in writing, photographs and the run-test video of the machine built for you, and the phase 2 mill quotation for BH-260 on its own schedule. Request the phase 1 quotation and the phase 2 upgrade price →
Q6: Where do the magnets and metal traps go on a starter line?
Four positions. The first is the raw intake before the grinding mill, where bag stitching wire and the odd freight bolt are caught. The second is the grinder discharge ahead of the mixer inlet, the last cheap chance to catch what the hammers threw off. The third is over the mixer top inlet. The fourth is reserved at the phase 2 mill feed. Confirm magnet diameter, housing material and whether the clean-out is a quick-release cover or a bolted lid, because a magnet you cannot clear without a spanner gets bypassed.
Hot Tags: 300-500 kg/h Poultry Feed Starter Production Line, China 300-500 kg/h Poultry Feed Starter Production Line manufacturers, suppliers, factory, stationary feed pellet machine, stainless steel feed pellet machine, agricultural waste feed pellet machine, easy to use feed pellet machine, feed pellet machine for pet food, floor standing feed pellet machine